This week’s assignment is to create a work breakdown structure (WBS) for the project
you selected during Unit 2. This is part of your Course Project.
Instructions:
Create a high-level WBS comprised of at least three levels:
• Each level should have with a minimum of five level 1 tasks, with two level 2
tasks, and three (3) Level 3 tasks.
• Describe each task (work package) in your WBS with just enough information so
that everyone in the team can understand what each work package means.
• Level Numbering:
o Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0.
o Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc.,
o The third level of tasks should be numbered 1.1.1, 1.1.2, 1.1.3, 1.2.1,
1.2.2. 1.2.3 etc